Strata Aggregates / Equipment Governance

Crusher Plant

Capacity, maintenance and leased-site governance.

CR-01 / operationally known as "Flint"

Operational Asset
Operational Signal: Seasonal capacity pressure active. Mobile crusher hire and site permissions require review before peak production.

Local operational review retained pending synchronisation from mobile plant inspection.

Status

Operational

Capacity Review

Seasonal Shortfall

Hire Requirement

Mobile Crusher Needed

Site Constraint

Leased Land

Asset Governance

Current Position

  • Base crusher operational Maintained through local operator knowledge and routine repair
  • Production expansion pressure identified Improved weather conditions increased stock-building demand beyond base crushing capacity
  • Temporary crusher deployment active Additional crushing capacity introduced for extended grading-line activity during the current production window

Lease Constraint

Site Ownership Context

  • Crusher owned by operating group Asset sits within group plant responsibility
  • Quarry site held under lease Land ownership sits outside the operating group
  • Capital upgrade decisions affected Permanent replacement or expansion may require lease and landlord review

Spatial Context

Operational Map

View the Aggregates operational map showing traffic flow, movement routes and related operational areas.

Seasonal Planning

Supplementary Crushing Capacity

  • Peak production window Additional crushing capacity likely required
  • Hire supplier booking Confirm mobile crusher availability before seasonal demand rises
  • Site approval check Confirm temporary plant operation aligns with lease and site permissions
  • Group visibility Capacity constraint visible to leadership before it becomes a production issue

Operational Risk

Governance Notes

  • Legacy plant dependency Current crusher remains operational but requires close monitoring
  • Knowledge concentration risk Performance depends partly on experienced local staff
  • Lease-linked investment constraint Asset strategy should be reviewed alongside site tenure
  • Operational Naming “Flint” remains the primary operational reference used by local plant staff.
  • Historic Records Older maintenance records may still reference Flint rather than CR-01.