Hold / Group Dashboard / Strata Logistics

Strata Logistics

Shift flow, dispatch recovery and warehouse movement under governed operational control.

Operations Hub

Amber Alerts

Site Items Raised 2 Active

Conditions affecting warehouse flow, dispatch capacity or route availability during the current shift.

South Dispatch Area : Surface water build-up slowing outbound vehicle movement.

Bay C03 : Forklift 03 operating under temporary restriction during dispatch recovery.

Red Alerts

Shift Items Escalated 0 Active

Items requiring immediate operational restriction, isolation or dispatch escalation.

No Active Escalations : No shift restrictions or emergency operational escalations currently active.

Start of shift

Today’s operational attention

Current operational conditions, dispatch restrictions and active warehouse issues affecting today’s shift.

Surface water slowing outbound flow

Heavy overnight rainfall has reduced drainage flow near the South Dispatch Lane, causing standing surface water and slower outbound vehicle movement during early loading activity.

Next action: Estates inspection due this morning before peak outbound movement.

Forklift 03 operating under temporary restriction

Hydraulic inspection pending. Temporary routing adjustments remain active around Bay C03 during peak outbound loading.

Shift focus: Maintain dispatch continuity during restricted forklift availability.

Dispatch route adjustment active

Bay C03 operating reduced dispatch volume during shutter maintenance activity. Temporary diversion routing remains active via the North Recovery Route.

Warehouse flow

Current shift flow

Live operational movement, recovery activity and dispatch flow during the current shift.

Inbound movement

Morning intake running steadily across inbound bays. Peak aggregate arrivals expected between 10:00–11:30.

Outbound dispatch

Recovery loading continuing through early shift following overnight backlog reduction. Four delayed consignments remain active for morning dispatch sequencing.

Yard routing

Temporary one-way routing remains active around Bay C03 during shutter maintenance works. Minor outbound slowing expected during peak vehicle movement periods.

Shift continuity

Night shift reduced delayed outbound backlog from 14 loads to 4 following extended overnight recovery loading across dispatch lanes.

Day shift focus: Prioritise remaining consignments before midday intake peak begins.

Operational workload

Today’s expected movements

Planned inbound intake, dispatch recovery and warehouse movement expected during the current shift.

07:00–09:00 Recovery loading continuing across dispatch lanes following overnight backlog reduction.
10:00–11:30 Peak aggregate intake expected across inbound bays and weighbridge routes.
11:30–13:00 Increased outbound dispatch sequencing expected following completion of morning intake activity.
Afternoon Reduced yard congestion expected following completion of peak loading and recovery activity.

Shift capability

Current operational capability

Workforce, equipment and operational support currently available to sustain today’s shift.

Workforce

  • Supervisor cover confirmed for early shift
  • Reduced forklift-certified availability until 09:30
  • Agency induction completed for two temporary operatives

Equipment & vehicles

  • Forklift 03 operating under temporary restriction
  • Temporary forklift hire under review
  • Outbound recovery planning under active operational review
  • Yard marshal vehicle unavailable pending maintenance review

Operational support

  • Maintenance lead on-site from 08:15
  • Estates inspection pending (time TBC)
  • Drainage review to determine temporary ground reinforcement needs

Overview

Current logistics position

Operational Points 10 Active
QR Deployments 10 / 10 Live
Scheduled Updates 2 Pending
Review Queue 3 Due This Week